Question: #425

MAT221 Week 2 Assignment Inequalities

The Space Age Furniture Company manufactures tables and cabinets to hold microwave ovens and portable televisions. These products are made in various sizes and with various features, but all follow basically the same production and assembly operations. However, two of these products—the Saturn microwave stand and the Gemini TV stand—have a part (no. 3079) that requires machining on a special lathe used only for making that part. At present the machine is run by Ed Szewczak, a machinist who also operates other machines in Space Age’s shop. Once set up and started, the lathe can run nearly unattended. How­ever, the machinist must be present (even if not actually attending the machine) any time one of the machines, including the lathe, is in operation. At present, Ed works a regular 40-hour week. However, due to the workload for producing part 3079, it has been neces­sary to schedule frequent overtime for him in order to finish the necessary parts on time.

 

 

Coral Snodgrass, operations manager for Space Age, has just heard from Ed’s foremen that Ed is becoming unhappy about so much overtime. As Coral knows, Ed has been with the company a long time and is an excellent, reliable employee. Skilled machinists with Ed’s experience and employment record are extremely difficult to find. Coral wonders what can be done to alleviate this problem.

Recently, Space Age began using an MRP system that has helped reduce inventories greatly and improve on-time deliveries. In fact, Space Age carries no finished-goods inventory. Instead, everything in the master schedule is being produced for customer orders, so all products are shipped almost immediately. Previously Space Age had estimated that it cost $1.25 per week to store each Gemini and $1.50 per week to store each Saturn that wasn’t shipped immediately. The master schedule for producing these two items for the next six weeks is shown below.

Master Schedule

Week 

  

  

 

 

 

  

Gemini

600

400

700

500

400

600

Saturn

300

400

400

600

300

300

The part in question, 3079, is used in two different subassemblies: no. 435, which is used in the Gemini TV stand, and no. 257, which is used in the Saturn microwave stand. One of part 3079 is used in each subassembly, and one of each subassembly is used in each of the final products.

Part 3079 may be produced in any quantity since the lathe that makes it is not used for anything else. However, both of the subassemblies are produced using the same equip­ment. To minimize change over time, Space Age has decided that these subassemblies should be made in minimum quantities of 1,000 at a time, although there is no problem with capacity on the equipment that makes them. In fact, an order for 1,000 of subassem­bly 435 is due to be received in week 1, as is an order for 1,000 of subassembly 257. Lead time for both these subassemblies is one week, and no inventory is expected to be on hand for either part at the beginning of week 1. There is not any on-hand inventory of part 3079, and there are no orders in process.

Ed Szewczak earns $22 per hour and gets a 50% premium for any overtime work. When­ever part 3079 is made, there is no set-up time, but processing takes 0.03 hour per unit. It costs $0.25 per week to hold any of these parts over from one week to the next. The cost of holding each subassembly in inventory is $0.75 per unit per week.

1.  What options are open to Coral to address this problem?

2.  How would reducing the minimum quantity of subassemblies help?

3.  What are the costs of carrying excess items in inventory at each stage?

4.  What is the trade-off between overtime costs and inventory costs?


The final case study should demonstrate understanding of the reading as well as the implications of new knowledge. The paper should integrate Readings and Resources and class discussions into work and life experiences. It may include explanation and examples from previous events as well as implications for future applications.


The purpose of the Final Case is for you to culminate the learning achieved in the course by describing your understanding and application of knowledge in the field of operations management.


Guidelines for Writing the Final Paper


Readdress the concept and the experience with critical thought. That is, what is your response to the content, either positive or negative, and then defend your position. If multiple options/alternatives/positions are present and are being rejected you must also defend the reasons for rejecting an option.


Conclude with a restatement of the thesis and a conclusion paragraph.

Paper must be ten- to- twelve double-spaced-pages in length, exclusive of Appendix, References, Exhibits, etc., and formatted according to APA style as outlined in the Ashford Writing Center.

The paper must use at least five “outside” scholarly sources suitable for research in a graduate level course.


Writing the Final Paper

The Final Paper:


Must be ten to twelve double-spaced pages in length and formatted according to APA style as outlined in the Ashford University Writing Center.

Must include a cover page that includes:

- Title of paper

- Student’s name

- Course name and number

- Instructor’s name

- Date submitted

Must include an introductory paragraph with a succinct thesis statement.

Must address the topic of the paper with critical thought.

Must end with a conclusion that reaffirms your thesis.

Must use at least five "outside" scholarly resources.

Must document all sources in APA style, as outlined in the Ashford Writing Center.

Must include a reference page that is completed according to APA style as outlined in the Ashford Writing Center.

Solution: #443

MAT/221 Week 2 Assignment Inequalities

MAT 221 ...

Tutormaster
Rating: A+ Purchased: 11 x Posted By: Algebraexpert
Comments
Posted by: Algebraexpert

Online Users